The oldest, Foat, does drama at the same drama company I went to as a child and will soon be performing in his first play.
Talking to the director at knitting on Monday night I mentioned that if they needed help with costumes, I could rev up the machine. She laughed and said she'd already dobbed me in to do it.
So last night I had the call. 58 pairs of calico pants and a dozen or so aprons. Fine I don't have to do them all, another mum will be doing some as well.
But the catch is the art director has yet to get the material. So by the time this happens I'll have less than a fortnight to do about 30 pants, and considering I have the same deadline for Zegal's jumper for the snow and several big craft markets to sew for I'm thinking of getting drunk!
So it's going to be a busy time ahead. I don't mind the doing the costumes, but only a fortnight to get so much done is really pushing it and I have a feeling the other mum (who has worked in the fashion industry) would probably have the same feelings as I do towards the art director. It's not as if he hasn't had a year's notice of when the play would be and the gist of the script.
And of course I signed up for Southern Summer of Socks.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment